Resource-Detail-Hero

South Suburban Reservoir closure

April 2024 - Spring 2025

Body of water with a rocky shore visible in the distance on a cloudy day. A sign on the shore reads "No fishing, no human swimming"

South Suburban Reservoir in the Stratton Open Space in Colorado Springs is closed to the public while repairs are made to the dam’s outlet. The integrity of the dam remains intact, but the outlet must function properly to ensure we can continue to move water from the reservoir to treatment.

The reservoir holds raw water from our local watersheds and is an integral component of our local water system. An issue with the outlet was discovered in early April 2024 during a routine inspection, and the need for repairs was further confirmed by state dam officials.  A timeline for those repairs is below.

Water service for our customers will not be impacted while the reservoir is temporarily out of service, as we can access supplies from other reservoirs in our system for the interim. The reservoir will not be available to the public until repairs are completed.

Project timeline

• April 3, 2024: Issue discovered during an internal dam inspection. Further assessment by our dam safety engineer and state dam officials confirmed the need for prompt repairs to the outlet
 
April 12: Reservoir access closed to the public.

✔ April 12 - April 30: Controlled draining of the reservoir completed.  

✔ May 1 - May 17: The remaining 10' of water was drained through the outfall pipe in a slow and controlled manner to mitigate trail erosion and potential customer impacts.

  • Collaborated with City Parks to expand one culvert and clean several culverts, both public and private, prior to draining.
  • All water released from the reservoir was accounted for and traded to downstream users to ensure the best use of supplies.
✔  May 29: Construction design for repairs started.

✔ July 23: Design completed.

✔ July 30: Design workshop.

✔ August 8: Design submitted to the State of Colorado Engineer Office for approval.

• November: Anticipated construction start date (dependent on material lead times). 

• Spring 2025: Anticipated construction complete.

The community is asked to please respect construction perimeters in place as we work to return South Suburban Reservoir to service.

Questions or concerns may be directed to (719) 668-7765 or engage@csu.org.

Current projects

Kelker Substation Expansion Project

Kelker Substation Expansion Project

The Kelker substation expansion project addresses our plan to improve system reliability and expand resources to meet growing energy demands. The Kelker substation expansion project addresses our plan to improve system reliability and expand resources to meet growing energy demands. The Kelker substation expansion project addresses our plan to improve system reliability and expand resources to meet growing energy demands.

Read Now Read Now
Marksheffel Water Main Installation

Marksheffel Water Main Installation

We are working to improve the reliability of our water system on Marksheffel Rd. We are working to improve the reliability of our water system on Marksheffel Rd. We are working to improve the reliability of our water system on Marksheffel Rd.

Read Now Read Now
Jackson Fuller Energy Storage Project

Jackson Fuller Energy Storage Project

The Jackson Fuller energy storage project helps us store excess energy for use during periods of low generation or high demand. The Jackson Fuller energy storage project helps us store excess energy for use during periods of low generation or high demand. The Jackson Fuller energy storage project helps us store excess energy for use during periods of low generation or high demand.

Read Now Read Now
Fiber Network

Fiber Network

Colorado Springs will be one of the best-connected cities in the country, enabling the highest-speed internet connectivity for every home and ... Colorado Springs will be one of the best-connected cities in the country, enabling the highest-speed internet connectivity for every home and ... Colorado Springs will be one of the best-connected cities in the country, enabling the highest-speed internet connectivity for every home and ...

Read Now Read Now
Star Ranch Pump Station

Star Ranch Pump Station

The Star Ranch Pump Station will improve water supply for fire protection, improve water quality and reduce the risk of water outages. The Star Ranch Pump Station will improve water supply for fire protection, improve water quality and reduce the risk of water outages. The Star Ranch Pump Station will improve water supply for fire protection, improve water quality and reduce the risk of water outages.

Read Now Read Now
Martin Drake Power Plant

Martin Drake Power Plant

The demolition of the Martin Drake Power Plant has a tentative completion date at the end of 2024, barring unexpected delays. The demolition of the Martin Drake Power Plant has a tentative completion date at the end of 2024, barring unexpected delays. The demolition of the Martin Drake Power Plant has a tentative completion date at the end of 2024, barring unexpected delays.

Read Now Read Now
Central Bluffs Substation

Central Bluffs Substation

The Central Bluffs Substation project will modernize our infrastructure for sustainability, system resiliency and reliability. The Central Bluffs Substation project will modernize our infrastructure for sustainability, system resiliency and reliability. The Central Bluffs Substation project will modernize our infrastructure for sustainability, system resiliency and reliability.

Read Now Read Now
Continental Hoosier System Project

Continental Hoosier System Project

The goal of the Continental-Hoosier System Project is to improve the resiliency, redundancy and efficiency of this important part of our water system. The goal of the Continental-Hoosier System Project is to improve the resiliency, redundancy and efficiency of this important part of our water system. The goal of the Continental-Hoosier System Project is to improve the resiliency, redundancy and efficiency of this important part of our water system.

Read Now Read Now
Smart meters

Smart meters

Upgraded meters allow two-way communication between your home or business and our systems. Upgraded meters allow two-way communication between your home or business and our systems. Upgraded meters allow two-way communication between your home or business and our systems.

Read Now Read Now
Monument Creek stabilization project

Monument Creek stabilization project

Our work to stabilize a section of Monument Creek is complete! Critical wastewater infrastructure that lies beneath the creek bed is now protected. Our work to stabilize a section of Monument Creek is complete! Critical wastewater infrastructure that lies beneath the creek bed is now protected. Our work to stabilize a section of Monument Creek is complete! Critical wastewater infrastructure that lies beneath the creek bed is now protected.

Read Now Read Now
Northern Monument Creek Interceptor Project

Northern Monument Creek Interceptor Project

The proposed Northern Monument Creek Interceptor would save money, improve reliability, plan for growth and ensure compliance with regulations. The proposed Northern Monument Creek Interceptor would save money, improve reliability, plan for growth and ensure compliance with regulations. The proposed Northern Monument Creek Interceptor would save money, improve reliability, plan for growth and ensure compliance with regulations.

Read Now Read Now
South Catamount Dam Rehabilitation Project

South Catamount Dam Rehabilitation Project

We are completing necessary maintenance and improvements to South Catamount Reservoir, preserving and extending the life of the dam for decades to ... We are completing necessary maintenance and improvements to South Catamount Reservoir, preserving and extending the life of the dam for decades to ... We are completing necessary maintenance and improvements to South Catamount Reservoir, preserving and extending the life of the dam for decades to ...

Read Now Read Now
Williams Creek Substation

Williams Creek Substation

The Williams Creek substation was expanded to accommodate the new Pike Solar Array and interconnect to the transmission line from the Nixon Power ... The Williams Creek substation was expanded to accommodate the new Pike Solar Array and interconnect to the transmission line from the Nixon Power ... The Williams Creek substation was expanded to accommodate the new Pike Solar Array and interconnect to the transmission line from the Nixon Power ...

Read Now Read Now
Briargate Substation & Transmission Line

Briargate Substation & Transmission Line

The Briargate Substation and Transmission Line Project was completed in 2023, and it supports our efforts to deliver reliable energy to our community. The Briargate Substation and Transmission Line Project was completed in 2023, and it supports our efforts to deliver reliable energy to our community. The Briargate Substation and Transmission Line Project was completed in 2023, and it supports our efforts to deliver reliable energy to our community.

Read Now Read Now
Midway-Kelker Transmission Line Project

Midway-Kelker Transmission Line Project

The Midway-Kelker transmission line project supports the Sustainable Energy Plan (SEP) goal to provide safe and reliable energy systems. The Midway-Kelker transmission line project supports the Sustainable Energy Plan (SEP) goal to provide safe and reliable energy systems. The Midway-Kelker transmission line project supports the Sustainable Energy Plan (SEP) goal to provide safe and reliable energy systems.

Read Now Read Now
Kelker-South Plant Transmission Line Project

Kelker-South Plant Transmission Line Project

The Kelker to South Plant transmission line improves system reliability and meets growing electrical demand at a reasonable cost. The Kelker to South Plant transmission line improves system reliability and meets growing electrical demand at a reasonable cost. The Kelker to South Plant transmission line improves system reliability and meets growing electrical demand at a reasonable cost.

Read Now Read Now
Horizon Substation project

Horizon Substation project

The Horizon Substation will help improve system reliability by expanding our resources to meet the growing energy needs. The Horizon Substation will help improve system reliability by expanding our resources to meet the growing energy needs. The Horizon Substation will help improve system reliability by expanding our resources to meet the growing energy needs.

Read Now Read Now
Cottonwood-Fuller transmission line project

Cottonwood-Fuller transmission line project

We replaced the conductor (wire) with a better conductor to increase energy flow between Cottonwood and Fuller Substations. We replaced the conductor (wire) with a better conductor to increase energy flow between Cottonwood and Fuller Substations. We replaced the conductor (wire) with a better conductor to increase energy flow between Cottonwood and Fuller Substations.

Read Now Read Now
N. Academy Boulevard water valves replacement project

N. Academy Boulevard water valves replacement project

We are working to improve water service on North Academy Boulevard as part of a three-phase project. We are working to improve water service on North Academy Boulevard as part of a three-phase project. We are working to improve water service on North Academy Boulevard as part of a three-phase project.

Read Now Read Now
Electrical Cable Rejuvenation Program

Electrical Cable Rejuvenation Program

By injecting a silicone-like fluid into underground electrical cables, we can help them last for decades longer, improving reliability and saving ... By injecting a silicone-like fluid into underground electrical cables, we can help them last for decades longer, improving reliability and saving ... By injecting a silicone-like fluid into underground electrical cables, we can help them last for decades longer, improving reliability and saving ...

Read Now Read Now