Resource-Detail-Hero
Sustainable Energy Plan

Cottonwood-Fuller Transmission Line Project

A large metal power pole with crossbeams and suspended power lines. An industrial facility with small structures & a fence is visible in the distance

The Cottonwood-Fuller project replaced the conductor (wire) with a higher-performance conductor to increase energy flow between Cottonwood Substation in Colorado Springs and Fuller Substation near Falcon. The new conductor runs on the existing supporting towers. This uprating will improve the electrical system performance and overall reliability. 

The Cottonwood-Fuller transmission line project supports the Sustainable Energy Plan's goal of providing a safe and reliable energy system. Mitigation efforts like upgrading conductors, fortify our electric grid so we can meet the growing needs of our community. This project was substantially completed in March 2023.

Sustainable Energy Plan projects

Our vision is coming to life. We’re working on projects across our community that improve the electric grid, reduce emissions, increase clean energy use and provide safe, affordable energy for our community.

Jackson Fuller Energy Storage Thumbnail
Current project

Jackson Fuller Energy Storage

Jackson Fuller energy storage uses large-scale lithium-ion batteries to store energy. It supports renewable sources like solar and wind by storing excess energy for use when it's needed. Jackson Fuller energy storage uses large-scale lithium-ion batteries to store energy. It... Jackson Fuller energy storage uses large-scale lithium-ion batteries to store energy. It supports renewable sources like solar and wind by storing excess energy for use when it's needed.

Learn more Learn more
Kelker Substation 1920px
Current project

Kelker Substation Expansion

The Kelker Substation Expansion Project almost doubles the substation's size to accommodate growing energy demands in southeast Colorado Springs. The Kelker Substation Expansion Project almost doubles the substation's size to... The Kelker Substation Expansion Project almost doubles the substation's size to accommodate growing energy demands in southeast Colorado Springs.

Learn more Learn more
Kelker South Thumb 1920
Current project

Kelker-South Plant Transmission Line

The Kelker-South Plant Transmission line project connects two of our existing substations, improving system reliability and meeting growing demand. The Kelker-South Plant Transmission line project connects two of our existing... The Kelker-South Plant Transmission line project connects two of our existing substations, improving system reliability and meeting growing demand.

Learn more Learn more
Drake Progress August 2024 1920
Current project

Martin Drake Power Plant Demolition

After less than two years of careful mitigation efforts, major demolition efforts of the former Martin Drake Power Plant are complete. After less than two years of careful mitigation efforts, major demolition efforts of the... After less than two years of careful mitigation efforts, major demolition efforts of the former Martin Drake Power Plant are complete.

Learn more Learn more
Pike Solar 1920 px
Completed project

Pike Solar Facility

The Pike Solar Facility is now generating and delivering electricity. The 175-megawatt solar array, located on 1,310 acres, was placed into operation in December 2023. The Pike Solar Facility is now generating and delivering electricity. The 175-megawatt... The Pike Solar Facility is now generating and delivering electricity. The 175-megawatt solar array, located on 1,310 acres, was placed into operation in December 2023.

Learn more Learn more
Briargate Substation 1920 px
Completed project

Briargate Substation and Transmission Line

The Briargate Substation and Transmission Line project added infrastructure to increase transmission capacity and improve grid reliability. The Briargate Substation and Transmission Line project added infrastructure to increase... The Briargate Substation and Transmission Line project added infrastructure to increase transmission capacity and improve grid reliability.

Learn more Learn more
Horizon Substation 1920 px
Completed project

Horizon Substation

The Horizon Substation is a new substation that supports transmission reliability, and the growing electrical distribution needs of our community. The Horizon Substation is a new substation that supports transmission reliability, and... The Horizon Substation is a new substation that supports transmission reliability, and the growing electrical distribution needs of our community.

Learn more Learn more
Midway Kelker 1920 px
Current project

Midway-Kelker Transmission Line

The Midway-Kelker project will upgrade the current transmission line to increase our system’s capacity. The Midway-Kelker project will upgrade the current transmission line to increase our... The Midway-Kelker project will upgrade the current transmission line to increase our system’s capacity.

Learn more Learn more
Williams Creek Substation 1920
Completed project

Williams Creek Substation

Williams Creek Substation was upgraded and expanded to interconnect renewable energy generation and to support a reliable, cost-effective energy system. Williams Creek Substation was upgraded and expanded to interconnect renewable energy... Williams Creek Substation was upgraded and expanded to interconnect renewable energy generation and to support a reliable, cost-effective energy system.

Learn more Learn more